Duplex rezidențial în Mogosoaia
Oct 26, 2018 |
Private,  |
admin

Splendid duplex proiect finalizat în 2014 de Lead Architect Dl. Vitalie Cataraga - cu două zone distincte de living pentru parter și etaj, inclusiv construcţile adiacente. Suprafața totală construită este de 460 mp, iar detaliile sunt descrise pentru fiecare fotografie. Acest proiect a implicat planificarea arhitecturală și executarea construcției.

Family Villa in Bucharest
Oct 26, 2018 |
Private,  |
admin

Proiect proiectat și construit de Studio Art Construct (2016-2017). Trei etaje (2 dormitoare, 2 băi, zonă de luat masa și bucătărie, bucătărie superioară, zonă de joacă, birou, spălătorie și cameră de depozitare, sală tehnică) terasă, grădină amenajată, garaj și fixare. Suprafața totală construită este de 426 mp

Family Villa Green Paradise, Corbeanca
Nov 23, 2017 |
Private,  |
admin

This daring project was begun in 2014 on a total built area of 340sqm and has all the properties and quality of materials worthy of the area in which it was built.

It is proposed the structure of resistance of reinforced concrete frames anchored in continuous reinforced concrete foundations, as well as panels of each level. The masonry is made of 30cm porotermic brick.

To ensure the necessary thernuc comfort, the thermic insulation of the 15cm basalt mineral wool was finished with reinforced plaster structured with glass fiber mesh and, of course, the washable exterior paint.

The exterior joinery was made of double-insulated aluminum. The interior finishes include warm parquet and carpets as well as ceramic and concrete tiles. Sanitary groups have floor finishes and wall tiles. The cover was made on a ceramic tiled wood grate. The structure of the traps used was a well-treated, anti-corrosive and flame-treated resin.</p

Project name 3
Nov 1, 2017 |
Private,  |
admin

Year
2015

Client
Private

Status
in progress

Surface/Cost
430/mp

Cam5.jpg Cam4.jpg Cam3.jpg Cam1.jpg

STRATUM
Nov 1, 2017 |
Public,  |
admin

The project is situated in a developing industrial area in Bucharest. The main requirement of the client was to satisfy the need for office spaces in one of the production halls of the factory. The existing metal structure of the production hall was extended vertically in such a way that the roofed profile of the structure is kept. However the screen like main facade has a better relation with the street area and main access point. The overall feeling is that of a mineral courtyard, with and colored accent. The fiber-cement main facade is separated by U-profile metallic elements into vertical and horizontal registers, one of them being the central glazed area where the main access into the building is situated, and marked by a green cross made out of beams and columns. The colors and the materials were chosen to enhance the visual identity of the client’s brand, and keep the overall design of the building in the industrial design idea. The interior space is thought as an atrium, with all the office spaces and other functions revolving around a central piece represented by the glass conference room and the main skylight. The dark grey and white colors chosen for the interiors are neutral, creating a crisp and clean working environment.

Apartament Cortina Residence
Nov 1, 2017 |
Private,  |
admin

Year
2015


Client
Private


Status
in progress

Surface/Cost
430/mp

10.jpg 9.jpg 11.jpg 12.jpg 13.jpg 8.jpg 7.jpg 3.jpg 2.jpg 4.jpg 5.jpg 6.jpg 1.jpg